Supermicro CSE-846A-R1200B Manual de usuario Pagina 37

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 97
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 36
4-17
Chapter 4: Chassis Setup and Maintenance
4-9 Changing the Power Distributor
Server chassis above 2U require a power distributor. The power distributor provides
failover and power supply redundancy. In the unlikely event you must change the
power distributor, do following:
Changing the Power Distributor
Power down the server and remove the plug from the wall socket or power 1.
strip.
Remove all cable connections to the power supply from the motherboard, 2.
backplane, and other components. Also, remove both power supplies.
Figure 4-19: Removing the Power Distributor Cover
Power
Distributor
Cover
Power Supply
Power Distributor Board
Mounted in the tray on
the chassis wall
Fan Row
Vista de pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 96 97

Comentarios a estos manuales

Sin comentarios